21 julho, 2013

Maquina Perfuradora

Xandria - Vampire







FOB Pret:
US $ 16.800-25.000 / JogoObter Ultima Pret
Port:
Tianjin
Cantitatea minimă de comandă:
1 Set / Seturi
Aprovizionare Capacitatea:
15 Set / seturi pe lună
Timp de livrare:
10 zile după primirea depozitului
Conditii de plata:
L / C, T / T, Western Union



PETRÓLEO
Reservas109 barris1,40
Produção (óleo cru + LGN)103 barris/dia127,00
Consumo103 barris/dia207,00
Capacidade de refino103 barris/dia504,00









CARRO VOADOR (SKY CAR) HYDROGEN ENERGY











MIT (Massachusetts Institute of Technology)
EMBRAER (Empresa Brasileira Aeronautica S/A)























Worldwide Installed Geothermal Generating Capacity
Country
1990 MWe
1995 MWe
2000 MWe
Argentina
0.7
0.7
0.0
Australia
0.0
0.2
0.2
China
19.2
28.8
29.2
0.0
55.0
142.5
95.0
105.0
161.0
Ethiopia
0.0
0.0
8.5
France (Guadeloupe)
4.2
4.2
4.2
0.0
33.4
33.4
Iceland
44.6
50.0
170.0
144.8
309.8
589.5
Italy
545.0
631.7
785.0
Japan
214.6
413.7
546.9
45.0
45.0
45.0
Mexico
700.0
753.0
755.0
283.2
286.0
437.0
35.0
70.0
70.0
891.0
1227.0
1909.0
Portugal (The Azores)
3.0
5.0
16.0
Russia (Kamchatka)
11.0
11.0
23.0
Thailand
0.3
0.3
0.3
Turkey
20.6
20.4
20.4
2774.6
2816.7
2228.0
Total
5831.7
6833.4
7974.1




Nenhum comentário:

Postar um comentário

midnightduke8 procure este none no Google
Find in the Google this name midnightduke8

(PIEH) Parceria Internacional para a Economia do Hidrogênio
(IPHE) International Partneship for lhe Hidrogen Economy